Building Permits

Who can apply for a permit?

Application for a permit shall be made by the owner or lessee of the building or structure, or agent of either, or by the registered design professional employed in connection with the proposed work.

Permits are required for:

  • New residential construction over 120 sq. ft.
  • Commercial development
  • Additions to existing structures
  • Garages(attached or detached)
  • Manufactured Homes
  • Pole barns (over 1000 sq ft)
  • Grain bins
  • Sheds (portable or permanent)
  • Signs (new or replacement)
  • Billboards
  • Communication, wind, or solar towers
  • Demolition of buildings
  •      Asbestos requirements for commercial demolition
  • Carports
  • Decks over 25 sq ft

What is required to apply for a building permit?

  • Applicant supplies a zoning permit if within the mile and ½ of the municipality (Jerseyville, Brighton, and corporate limits of Elsah)
  • Permit or letter from the Jersey County Health Dept. (1307 State Highway 109, 618-498-9569 Ext. 3016) for a septic system permit
  • See the 911 Coordinator and receive your 911 address if you haven’t done so already (201 W. Pearl, 618-498-5571 Ext. 153)
  • Detailed blueprints and a ResCheck are required
  • Must supply the license number of the plumber and roofing contractor used
  • All contracts for deed must be recorded in the Recorder of Deeds Office (200 N. Lafayette St.)
  • If building permit is for a commercial/industrial structure, plans and specifications designed by the architect that is licensed and registered in the State of Illinois are required. The seal must appear on all sheets of the plans and specifications.  A ComCheck is also required.
  • Flood elevation certificate (if applicable)
  • County Code Administrator determines if site, or any portion of the site, is within a floodplain
  • Applicable building permit fees
    • ADDITIONAL INFORMATION FOR MOBILE HOMES
  • Copy title or bill of sale of modular/manufactured home including year, make/model, and serial number (per Illinois state statute no mobile home constructed before June 15, 1976 can be brought into the state.
  • Value of the Home or square footage
  • A site plan indicating the location of the home and distance from all property lines.
  • Land owner's written approval(notarized)
  • If land is being purchased contract for deed, it must be recorded in the County Recorder's office.
  • Manufactured/Modular Homes permit requires a copy of the title or copy of Bill of Sale to include year, make, model, and serial number. (See link)

County Permit Fee Schedule

Commercial Permit Packet

Residential Permit Packet

Manufactured Homes

Sign Permit Application

Wind-Tower Application

Limited/Demolition Permit Information

 

What type of payment is required?

  • Cash
  • Checks made payable to: Jersey County

Exemptions:

What is the time limitation of a building permit?

  • A permit for any proposed work shall be invalid within 180 days after the date it is issued
  • Expired permits before construction is completed require a written letter stating why the work is not completed and how long it will take to complete the project. The request is to be submitted to the Jersey County code Administrator's Office for review. Once a determination is made a letter will be mailed either allowing or denying a 3 month extension. Any extension requiring more than 3 months requires a permit renewal fee of one half of the original permit fee. The fee is to be paid prior to any continuing construction.

Building inspection guidelines:

  • Building permit shall be posted
  • Call 24 hours prior to needing an inspection.  Have a permit number; construction address and owner’s name if available.
  • All required inspections are covered under building permit
  • Illinois State Plumber (618-656-6680) will do all plumbing inspections

The Jersey County Code Administrator’s Office is currently following the adopted or state mandated codes:

  • 2015 Illinois Energy Conservation Code
  • 2015 International Residential Code
  • 2015 International Building Code
  • 2014 National Electric Code
  • 2014 Illinois Plumbing Code
  • 2015 International Fire Code
  • 2015 International Fuel Gas Code
  • 2015 International Mechanical Code
  • 2015 International Property Maintenance Code
  • Current edition of the Illinois Accessibility Code
  • Radon Resistant Construction Act

 

Building Code and Energy Links

Consumer Product Safety

Radon Resistant Construction Act

Click Here for Radon information

  • 2015 Illinois Energy Conservation Code
  • Radon Basics